
New TopShim run:

version = topshim 2.0.0
date = 2021-05-06
time = 19:37:24.664
command = topshim  fine h2o_1.7mm ordmax=5 shigemi

FINE SHIMMING

Parameters:

probe = Z150329_0015
solvent = 5%DMSOinH2O_1.7mm
shim nucleus = 1H
nucleus optimised for = 1H
o1p (set) = 4.59 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.0 Hz, Target= 0.3 Hz, After= 4.3 Hz
Iteration  2: FWHM Before= 4.3 Hz, Target= 0.2 Hz, After= 1.5 Hz
Iteration  3: FWHM Before= 1.5 Hz, Target= 0.2 Hz, After= 1.1 Hz
Iteration  4: FWHM Before= 1.1 Hz, Target= 0.3 Hz, After= 1.8 Hz
Iteration  5: FWHM Before= 1.8 Hz, Target= 0.2 Hz, After= 1.1 Hz
Diverging behaviour detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 1.04


Sample position (Shigemi) = -0.53 - 0.65 cm.

shim changes: 
Z	+197
Z2	-45
Z3	+576
Z4	+541
Z5	-5435

duration = 50 sec
completed successfully
finished Thu May  6 19:38:12 2021


========================================================================
