
New TopShim run:

version = topshim 2.0.0
date = 2021-05-12
time = 01:27:43.698
command = topshim  fine h2o_1.7mm ordmax=5 shigemi

FINE SHIMMING

Parameters:

probe = Z150329_0015
solvent = 5%DMSOinH2O_1.7mm
shim nucleus = 1H
nucleus optimised for = 1H
o1p (set) = 4.59 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.1 Hz, Target= 1.0 Hz, After= 4.4 Hz
Iteration  2: FWHM Before= 4.4 Hz, Target= 1.0 Hz, After= 1.7 Hz
Iteration  3: FWHM Before= 1.7 Hz, Target= 1.0 Hz, After= 1.9 Hz
Iteration  4: FWHM Before= 1.9 Hz, Target= 1.0 Hz, After= 2.7 Hz
Iteration  5: FWHM Before= 2.7 Hz, Target= 1.0 Hz, After= 2.8 Hz
Diverging behaviour detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D spectrum, spinning) = 1.6


Sample position (Shigemi) = -0.53 - 0.66 cm.

shim changes: 
Z	-234
Z2	-81
Z3	-415
Z4	+1449
Z5	+3975

duration = 51 sec
completed successfully
finished Wed May 12 01:28:32 2021


========================================================================
